Construction progress... Our projects are still putt-putting along, though at a much-reduced pace through the holidays and nasty weather. Our mud room is currently the most nearly finished – the photo at right is a view of its inside, as seen from our entranceway looking south toward the front door. We're pretty happy with how it turned out. The finished room will look quite different, however, as there will be cabinetry along both sides of the room (left and right in the photo).
The tile guys were here this morning. They grouted the mud room tile (photo at left), made a perfectly rectangular hole for me to cut a threshold for (for the door between the entranceway and the mud room), and repaired the broken tiles in the kitchen (from the installation of the door to the deck a month ago). They did a great job on all parts of it. Now we're waiting for tile to come in so they can finish our sun room. We have no ETA, unfortunately...
No comments:
Post a Comment